Norfolk Southern – Switch Replacements and New Track Construction – 2019
The Situation
Tracks throughout the area needed updating, including the replacement of several switches.
Cooper Contracting repaired timber bridge components of more than 30 different bridges as part of P&L’s bridge maintenance. The rehab scope consisted of replacing posts, caps, building and installing frame bents, replacing stringers, replacing and resetting ballast retainers and replacing ties
Matt
Our Solution
Cooper Contracting replaced the outdated switches, as always, with safety and efficiency as the number one objective.