Cooper Contracting

CSX Transportation – Bridge 00F 350.00 Arlington, TN 2017

The Situation

A 217-foot long bridge in Arlington TN was in need of updating to meet current safety requirements.

Our Solution

Cooper Contracting replaced the outdated 217-foot long bridge with a brand new 145-foot long bridge and 72 feet of engineered fill. The new bridge consisted of 36-inch diameter reinforced concrete-filled pipe piling with precast concrete caps.

Share This