Cooper Contracting

Indiana Southern – Trestles Over The White River Drift Clearing

The Situation

A large amount of debris (or drift) was trapped in a bridge, causing increased stress to the bridge.

Our Solution

We utilized a 60’ long reach trackhoe to help push drift through the bridge to relieve the undue stress from the forces of the drift and increased hydraulic pressures brought on by the trapped drift.

Share This