CSX Transportation – Bridge 00H 268.40 Earlington, KY – 2016
The Situation
A 109 foot long timber bridge was in need of replacing due to necessary safety measures, and rot.
Our Solution
We replaced the 109 foot long timber bridge with a 94 foot precast concrete bridge. The new bridge consisted of 36 inch diameter concrete filled pipe piling with precast concrete caps.