Cooper Contracting

Hoosier Southern – Middle Fork Crooked Creek Bridge 2019

The Situation

Half of an old 270 foot timber bridge was in need of updating to meet current safety standards. Half of the bridge

Our Solution

We replaced half of the 270 foot long timber bridge with a steel and concrete ballast deck bridge. The new portion of the bridge consisted of steel H-Pile bents with precast concrete caps and precast concrete beams.This was accomplished with minimal disruption to traffic, and with safety as our first priority.

Share This