Norfolk Southern – 201.3w Waterway Crossing 2023
The Situation
Raise the track by 2′ while converting the open deck to a ballast deck.
Our Solution
Improvements to this section of the track included converting from an open deck to a ballast deck while raising the track by 2′ for 500′ on each side of the waterway crossing.