Indiana Railroad 8 Bridge Project 2018
The Situation
Eight bridges between Robinson, IN and Newton, IL needed to be updated, or replaced altogether.
Why They Hired Cooper Contracting
With our reputation for safely building quality bridges within 4 to 8 weeks, Cooper Contracting was the clear choice.
Our design-build experience with Cooper has shown them to be actively engaged in the design process with the goal of finding solutions to complete work safely, on-time and within budget. These same values have also been demonstrated on construction of projects that were contracted by design-bid-build.
Mathew Fletcher P.E., S.E.❘ Senior Vice President Hanson Professional Services Inc.
Our Solution
We replaced seven timber structures with steel, and precast bridges and replaced one structure with a culvert as part of a design-build project. Cooper Contracting teamed up with an engineering firm to provide the Railroad with an exceptional design and construction schedule.