Hoosier Southern – BR 8.1 Bridge Replacement 2024
Replaced wood trestle and 250' steel spans on driven H pile with steel piling and concrete spans leaving the bridge with a 132' clear girder span.
There are many ways Cooper Contracting can move your project in the right direction. Learn more about which service is right for you.
Replaced wood trestle and 250' steel spans on driven H pile with steel piling and concrete spans leaving the bridge with a 132' clear girder span.
Replaced the existing structure and raised the bridge and the approaching tracks by 2 ft.
Replaced 8 bridges between Robinson IN, and Newton IL